  1. #Ganttproject sourcecode install
  2. #Ganttproject sourcecode update
  3. #Ganttproject sourcecode archive
  4. #Ganttproject sourcecode full

It is Linux-native, but it also works fine on macOS and on Windows with GitHub Shell. There is also a very convenient tool called SDKMAN! for downloading and managing Java runtimes.

ganttproject sourcecode

#Ganttproject sourcecode full

Choose Full JRE option for your platform.Īnother Java Runtime with JavaFX is Azul Zulu. We recommend using BellSoft Liberica Java Runtime. GanttProject requires Java Runtime version 11+ with JavaFX modules.

#Ganttproject sourcecode install

Java Runtime is not included and you have to install it separately.

#Ganttproject sourcecode archive

ZIP archive distro can be used on any platform capable of running Java 11+. Double-click from the user interface or running dpkg -i ganttproject_-1_all.deb in the command line should work. You can install GanttProject deb package using your system package management tools, such as synaptic, Ubuntu software, apt, dpkg, etc. Installing any of them must be sufficient. The package lists a number of the known Java Runtime packages in the dependencies. GanttProject for Linux is packaged as a deb package and includes no Java Runtime. Ubuntu/Mint/ other Debian-based Linux distros You can launch GanttProject directly from the volume or drag it to Applications to install it on macOS system. The disk image appears as a volume in Finder. GanttProject for macOS is shipped as a self-sufficient disk image with a signed and notarized GanttProject application bundled with BellSoft Liberica Java Runtime. It requires Java Runtime to be installed. This distribution includes no native code and doesn't require Administrator privileges. If you can't or don't want to run program which your antivirus engine considers as infected, try using platform-independent ZIP archive. The MD5 sum of the original installer is a5fca7353ce1ec1364dff7e543e20786 You can check if you downloaded the original file by checking its MD5 checksum. If your anti-virus software reports positive result, this is most likely a false positive, provided that the file which you downloaded is the original one. The installer was checked by VirusTotal and at the moment of writing this no engines reported positive results (which is good). It doesn't mean that the file is infected, it rather means that an antivirus engine have seen malware which was packed using a similar installer. This is a known issue which happens to installers very often. Some anti-virus programs may report viruses in the installer. Possible reports from anti-virus software Default settings in the installer must be fine for the most of users. Just launch the installer after downloading. GanttProject for Windows is shipped as an executable installer bundled with BellSoft Liberica Java Runtime. GanttProject and Java Runtime totally require about 200Mb of the disk space. ZIP package requires Java 11+ runtime with JavaFX modules. DEB package for Linux requires any Java 11+ runtime. Packages for Windows and macOS are self-sufficient and do not require installing anything else. GanttProject runs on any modern hardware and operating system which is capable of running Java Runtime. Installation notes and system requirements There are also a few relatively minor new features which mostly improve application usability. GanttProject can now export projects directly as Excel documents and import them back.

#Ganttproject sourcecode update

Minor updates are delivered through the update channel and can be installed instantly. You don't need to download anything except GanttProject distro. GanttProject packages for Windows and macOS are bundled with Java Runtime. If you're working in a team and need to share projects, collaborate safely, keep the history of project revisions, track resource allocations across all projects, you have to try GanttProject Cloud. Integration with GanttProject Cloud GanttProject Cloud is a project collaboration service for GanttProject.